Tata Power 10 GW Wafer and Ingot Project
Sector: Power Generation (CCGT) • Location: India
Source: ET Manufacturing
Tata Power plans to set up a 10 gigawatt wafer and ingot plant as part of its backward integration to become a fully integrated solar manufacturer. The project is estimated to cost ₹6,500 crore and locations are being explored in states like Odisha, Tamil Nadu, and Andhra Pradesh. The company aims to finalize the project by January 2026.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Solar
- Location
- India
- Updated
- 22 Jul 2026
- Source
- ET Manufacturing
ConstructChat
Ask ConstructChat about Tata Power 10 GW Wafer and Ingot Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tata Power plans to set up a 10 gigawatt wafer and ingot plant as part of its backward integration to become a fully integrated solar manufacturer. The project is estimated to cost ₹6,500 crore and locations are being explored in states like Odisha, Tamil Nadu, and Andhra Pradesh. The company aims to finalize the project by January 2026. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | ET Manufacturing |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Solar |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
