Tata Power Jejuri-Hinjewadi Transmission Project
Sector: Steel • Location: Maharashtra, India
Source: Telangana NavaNirmana Sena
Tata Power received a Letter of Intent for the Jejuri-Hinjewadi transmission project in Maharashtra involving construction of a 115 km 400 kV double-circuit line on a Build-Own-Operate-Transfer basis with transmission services for 35 years.
- Status
- Closed
- Sector
- Steel, Power Generation (CCGT)
- Location
- Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Telangana NavaNirmana Sena
ConstructChat
Ask ConstructChat about Tata Power Jejuri-Hinjewadi Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tata Power received a Letter of Intent for the Jejuri-Hinjewadi transmission project in Maharashtra involving construction of a 115 km 400 kV double-circuit line on a Build-Own-Operate-Transfer basis with transmission services for 35 years. |
Original sector | Energy |
Location
Country | India |
State | Maharashtra |
Source
Source | Telangana NavaNirmana Sena |
URL |
More Details
Record type | Project |
Sector | Steel, Power Generation (CCGT) |
Article published date | 2025-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
