Tata Power Pethshivpur Windfarm
Sector: Wind • Location: India
Source: World Bank Group
Tata Power Renewable Energy Limited (TPREL, a wholly owned subsidiary of Tata Power)entered into an agreement with Maharashtra Government, to develop 49.5MW wind power project at Pethshivpur in Kolhapur district of Maharashtra. The project would be executed by Tata Power. The wind farm would involve the building of wind turbines of ReGen. The electricity generated from the project would be evacuat
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tata Power Pethshivpur Windfarm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tata Power Renewable Energy Limited (TPREL, a wholly owned subsidiary of Tata Power)entered into an agreement with Maharashtra Government, to develop 49.5MW wind power project at Pethshivpur in Kolhapur district of Maharashtra. The project would be executed by Tata Power. The wind farm would involve the building of wind turbines of ReGen. The electricity generated from the project would be evacuated to the state grid through Northern, Eastern, Western and North-Eastern grid of India. ReGen Powertech Private Limited would develop, construct, commission, operate and maintain the project at an all-inclusive price. Tata Power had entered into a PPA with TPREL (a private distribution company) on 16th January 2014, for purchase of wind energy from the 49.5MW wind energy project through a 13-year PPA, which would be sold in the Mumbai distribution region. The PPA would commence from 1st June 2014 and remain valid till 31st May,2027. The APPC (Average Power Purchase Cost) base tariff as per MERC tariff order (dated 29 April 2011 for Wind zone 1) was US$ 0.10/Unit (INR 5.37 per unit @53.44 INR/USD) for the first 13 years of operation. The transmission charges would be paid by TPREL to the state transmission utility.The total capacity of 32 MW was eligible for CDM benefits under UNFCC. The project attained financial closure on 24th February 2014 at a debt equity ratio of 70/30. The estimated project cost at the time of financial closure was US$ 51.6mn (INR 3150mn @61 INR/USD). Financing comprised a 13-year term loan of US$ 36.2mn (INR 2210mn) and sponsor equity of US$ 15.4mn (INR 940mn). The term loan had a grace period of 2-year 4-months and repayment schedule of 45 quarterly installments. The loan was provided by IDFC Limited. The project construction started in 2013 and was expected to be commissioned by March 2015. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in India
- Mundra Power Plant Gujarat
- Vallur Conventional 1000MW Thermal Power Plant India
- Tapovan Vishnugad Hydroelectric Power Plant Uttarakhand
- Dabhol Power Plant Ratnagiri District Maharashtra India
- Tamil Nadu Wind Farm
- Tiroda Super Critical Thermal Power Plant Maharashtra
- Polavaram Hydro Electric Project Andhra Pradesh
- East Coast Energy Private Limited (ECEPL)
