Tata Power Pumped Hydro Storage Project
One of 10,000+ projects Taiyo tracks in Maharashtra.
Source: Times of India
Tata Power is set to commence work on two pumped hydro storage projects in Maharashtra, with a combined capacity of 2,800 MW. The projects aim to ensure a 24×7 clean power supply and contribute to grid stability and renewable energy integration.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Hydro
- Location
- Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Times of India
ConstructChat
Ask ConstructChat about Tata Power Pumped Hydro Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tata Power is set to commence work on two pumped hydro storage projects in Maharashtra, with a combined capacity of 2,800 MW. The projects aim to ensure a 24×7 clean power supply and contribute to grid stability and renewable energy integration. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Maharashtra |
City | Mumbai |
Source
Source | Times of India |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
