Tata Power Visapur Windfarm

Sector: Raw Materials • Location: India

Source: World Bank Group

Project
Active

Tata Power Renewable Energy Limited (TPREL, a wholly owned subsidiary of Tata Power)entered into an agreement with Maharashtra Government, to develop 32MW wind power project at Visapur in Satara district of Maharashtra. The project would be executed by Tata Power. The wind farm would involve the building of 16 wind turbines of Kenersys K-82 make wind turbines 2MW capacity each. The electricity gen

Project Information FAQ

Project Information

5 Q
The project “Tata Power Visapur Windfarm” is an infrastructure initiative in the Raw Materials sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Tata Power Renewable Energy Limited (TPREL, a wholly owned subsidiary of Tata Power)entered into an agreement with Maharashtra Government, to develop 32MW wind power project at Visapur in Satara district of Maharashtra. The project would be executed by Tata Power. The wind farm would involve the building of 16 wind turbines of Kenersys K-82 make wind turbines 2MW capacity each. The electricity generated from the project would be evacuated to the state grid through Northern, Eastern, Western and North-Eastern grid of India. Kenersys India Private Limited would develop, construct, commission, operate and maintain the project at an all-inclusive price. Tata Power had entered into a PPA with TPREL (a private distribution company) for purchase of wind energy from the 32MW wind energy project through a 13-year PPA. The PPA would remain valid till December 31,2027. The APPC (Average Power Purchase Cost) base tariff as per MERC tariff order (dated 29 April 2011 for Wind zone 1) was US$ 0.10/Unit (INR 5.37 per unit @53.44 INR/USD) for the first 13 years of operation. The transmission charges would be paid by TPREL to the state transmission utility.The total capacity of 32 MW was eligible for CDM benefits under UNFCC. The project attained financial closure on 27th March 2014 at a debt equity ratio of 70/30. The estimated project cost at the time of financial closure was US$ 32.6mn (INR 1991.1mn @61 INR/USD). Financing comprised a 12-year 4-month term loan of US$ 22.8mn (INR 1393.8mn) and sponsor equity of US$ 9.7mn (INR 597.3mn). The term loan had a repayment schedule of 44 quarterly installments. The loan was provided by State Bank of India. Out of the total capacity of 32 MW, the Company had commissioned 24 MW by March 2014 and 26 MW by November 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data