Tata Power Visapur Windfarm
Sector: Commercial • Location: India
Source: World Bank Group
Tata Power Renewable Energy Limited (TPREL, a wholly owned subsidiary of Tata Power)entered into an agreement with Maharashtra Government, to develop 32MW wind power project at Visapur in Satara district of Maharashtra. The project would be executed by Tata Power. The wind farm would involve the building of 16 wind turbines of Kenersys K-82 make wind turbines 2MW capacity each. The electricity gen
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government, Raw Materials, Wind
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tata Power Visapur Windfarm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tata Power Renewable Energy Limited (TPREL, a wholly owned subsidiary of Tata Power)entered into an agreement with Maharashtra Government, to develop 32MW wind power project at Visapur in Satara district of Maharashtra. The project would be executed by Tata Power. The wind farm would involve the building of 16 wind turbines of Kenersys K-82 make wind turbines 2MW capacity each. The electricity generated from the project would be evacuated to the state grid through Northern, Eastern, Western and North-Eastern grid of India. Kenersys India Private Limited would develop, construct, commission, operate and maintain the project at an all-inclusive price. Tata Power had entered into a PPA with TPREL (a private distribution company) for purchase of wind energy from the 32MW wind energy project through a 13-year PPA. The PPA would remain valid till December 31,2027. The APPC (Average Power Purchase Cost) base tariff as per MERC tariff order (dated 29 April 2011 for Wind zone 1) was US$ 0.10/Unit (INR 5.37 per unit @53.44 INR/USD) for the first 13 years of operation. The transmission charges would be paid by TPREL to the state transmission utility.The total capacity of 32 MW was eligible for CDM benefits under UNFCC. The project attained financial closure on 27th March 2014 at a debt equity ratio of 70/30. The estimated project cost at the time of financial closure was US$ 32.6mn (INR 1991.1mn @61 INR/USD). Financing comprised a 12-year 4-month term loan of US$ 22.8mn (INR 1393.8mn) and sponsor equity of US$ 9.7mn (INR 597.3mn). The term loan had a repayment schedule of 44 quarterly installments. The loan was provided by State Bank of India. Out of the total capacity of 32 MW, the Company had commissioned 24 MW by March 2014 and 26 MW by November 2014. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government, Raw Materials, Wind |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm
