logo

Tata.ev MegaCharger Hub at The Leela Mumbai Hotel

One of 10,000+ projects Taiyo tracks in Maharashtra.

Source: electrive

Project
Completed

Tata Power, in collaboration with Tata Passenger Electric Mobility Limited, has opened the largest Tata.ev MegaCharger hub in Mumbai. The facility features eight DC chargers with dual charging guns, allowing 16 electric vehicles to charge simultaneously. It operates 24/7 on renewable energy and targets private car owners, taxis, ride-hailing fleets, and logistics operators. The hub is strategicall

Status
Closed
Sector
Warehouse, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Airport, Hotel
Location
Mumbai, Maharashtra, India
Updated
22 Jul 2026
Source
electrive

ConstructChat

Ask ConstructChat about Tata.ev MegaCharger Hub at The Leela Mumbai Hotel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Tata.ev MegaCharger Hub at The Leela Mumbai Hotel” is an infrastructure initiative in the Warehouse sector, located in Mumbai, Maharashtra, India. Taiyo aggregates data on it from electrive.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Tata Power, in collaboration with Tata Passenger Electric Mobility Limited, has opened the largest Tata.ev MegaCharger hub in Mumbai. The facility features eight DC chargers with dual charging guns, allowing 16 electric vehicles to charge simultaneously. It operates 24/7 on renewable energy and targets private car owners, taxis, ride-hailing fleets, and logistics operators. The hub is strategically located near the Chhatrapati Shivaji Maharaj International Airport and inside The Leela Mumbai Hotel.

Original sector

Infrastructure

Location

Country

India

State

Maharashtra

City

Mumbai

Source

Source

electrive

URL

More Details

Record type

Project

Sector

Warehouse, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Airport, Hotel

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project