Tau Power
Sector: Power Generation (CCGT) • Location: Kazakhstan
Source: World Bank Group
Tau Power acquired equity stakes in four CHP stations in east Kazakhstan in October 1997. The stations were the 240 MW Ust-Kamenongorsk TETS (heat and power station), the 50MW Leninogorsk TETS, the 50MW Sogrinsk TETS, and the 10 MW Semipalatinsk TETS.
Tau Power was originally created as a joint venture between AES Corp (85%) and Suntree Power of Israel (15%). Tau Power paid US$2.5 million for
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Tau Power acquired equity stakes in four CHP stations in east Kazakhstan in October 1997. The stations were the 240 MW Ust-Kamenongorsk TETS (heat and power station), the 50MW Leninogorsk TETS, the 50MW Sogrinsk TETS, and the 10 MW Semipalatinsk TETS. Tau Power was originally created as a joint venture between AES Corp (85%) and Suntree Power of Israel (15%). Tau Power paid US$2.5 million for the shares of the CHP companies. The company also committed to pay US$4 million in back wages. In 2000, the capacity of the plants was as follows: Ust-Kamenongorsk TETS (1464MW), Leninogorsk TETS (418MW), Sogrinsk TETS (349MW), and Semipalatinsk TETS (840). In November 2002, AES sold the Leninogorsk plant to Maverick Development Corp. [United States], and the Semipalatinsk plant to Karazhira Power, owned by coal company Semei-Komir. As of December 2003 the capacity of the plants was as follows: Ust-Kamenongorsk TETS (1356MW), Sogrinsk TETS (301MW) As of December 2008, the Tau Power portfolio of projects was wholly owned by AES, and consisted of Ust-Kamenongorsk TETS (1,354 MW) and Sogrinsk TETS (301 MW). 2000-2011 capacity from AES ARs. The big jump in capacity was in 2000 and I cannot find investment info about that. AES reports total capex figures for all operations in Kazakhstan. cannot get separate capex figures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
