logo

Tau Power

Sector: Power Generation (CCGT) • Location: Kazakhstan

Source: World Bank Group

Project
Active

Tau Power acquired equity stakes in four CHP stations in east Kazakhstan in October 1997. The stations were the 240 MW Ust-Kamenongorsk TETS (heat and power station), the 50MW Leninogorsk TETS, the 50MW Sogrinsk TETS, and the 10 MW Semipalatinsk TETS.

Tau Power was originally created as a joint venture between AES Corp (85%) and Suntree Power of Israel (15%). Tau Power paid US$2.5 million for

Project Information FAQ

Project Information

4 Q
The project “Tau Power” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kazakhstan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Tau Power acquired equity stakes in four CHP stations in east Kazakhstan in October 1997. The stations were the 240 MW Ust-Kamenongorsk TETS (heat and power station), the 50MW Leninogorsk TETS, the 50MW Sogrinsk TETS, and the 10 MW Semipalatinsk TETS. Tau Power was originally created as a joint venture between AES Corp (85%) and Suntree Power of Israel (15%). Tau Power paid US$2.5 million for the shares of the CHP companies. The company also committed to pay US$4 million in back wages. In 2000, the capacity of the plants was as follows: Ust-Kamenongorsk TETS (1464MW), Leninogorsk TETS (418MW), Sogrinsk TETS (349MW), and Semipalatinsk TETS (840). In November 2002, AES sold the Leninogorsk plant to Maverick Development Corp. [United States], and the Semipalatinsk plant to Karazhira Power, owned by coal company Semei-Komir. As of December 2003 the capacity of the plants was as follows: Ust-Kamenongorsk TETS (1356MW), Sogrinsk TETS (301MW) As of December 2008, the Tau Power portfolio of projects was wholly owned by AES, and consisted of Ust-Kamenongorsk TETS (1,354 MW) and Sogrinsk TETS (301 MW). 2000-2011 capacity from AES ARs. The big jump in capacity was in 2000 and I cannot find investment info about that. AES reports total capex figures for all operations in Kazakhstan. cannot get separate capex figures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data