Taxiway G Rehabilitation
Closed · Florida · Last reported Jun 2024
Source: Dodge USA
the following Airport project: Taxiway G Realignment to include demolition of the existing non-standard in-line taxiway at the approach of Runway 23, construction of a portion of the new taxiway at the correct location and rehabilitation of existing taxiway back to existing hangars. Project includes pavement demolition, new bituminous pavement, bituminous pavement rehabilitation, grading, drainage
- Status
- Closed
- Sector
- Airport, Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Williston, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Taxiway G Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the following Airport project: Taxiway G Realignment to include demolition of the existing non-standard in-line taxiway at the approach of Runway 23, construction of a portion of the new taxiway at the correct location and rehabilitation of existing taxiway back to existing hangars. Project includes pavement demolition, new bituminous pavement, bituminous pavement rehabilitation, grading, drainage, new taxiway edge lighting and runway threshold lights and pavement marking. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Williston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Airport, Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in United States of America
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- AIRPORT ROAD IN VIDALIA - TIA
- ATLANTA-CCO - CRRSA
- DAWSON - CARES ACT
- PROJECT ADMINISTRATION - FAA-3-13-SBGP-04-2009 - FY09 DISCR
- McRAE-ENVIRON. ASSMT. FOR PARALLEL TAXIWAY AREA IMPROVMENT
- REIDSVILLE- FUEL FACILITY CARD READER AND DESIGN OF RUNWAY
