Taxiway J Improvements
Sector: Water Supply and Storage • Location: Dubuque, Iowa, United States of America
Source: Dodge USA
This project will include construction of approximately 3,200 feet of taxiway on the west side of the airfield from Runway 13 to the mid-point of Runway 18/36. This project facilitates development of the westside of the airfield as the east side is nearly built out. Generally includes grading, storm sewer drainage and underdrains in preparation for paving and installing edge lights and pavement ma
- Status
- Prospective
- Sector
- Water Supply and Storage, Airport, Commercial, Road, Aerospace & Defense, Government, Waste Processing and Treatment
- Location
- Dubuque, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Taxiway J Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will include construction of approximately 3,200 feet of taxiway on the west side of the airfield from Runway 13 to the mid-point of Runway 18/36. This project facilitates development of the westside of the airfield as the east side is nearly built out. Generally includes grading, storm sewer drainage and underdrains in preparation for paving and installing edge lights and pavement markings. The City of Dubuque may be seeking a consultant to provide design / Engineering services ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Dubuque |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Airport, Commercial, Road, Aerospace & Defense, Government, Waste Processing and Treatment |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
