Taylor Five Apartment Building with Parking
Sector: Manufacturing (Industrial) • Location: Paterson, New Jersey, United States of America
Source: Dodge USA
Construction of a three floor addition to an existing three story vacant school for a total of 6 floors plus a basement. Convert the vacant school into a 60 unit apartment building. The basement will consist of a two-bedroom apartment for the superintendent, utility room, community room and a gym. The first through sixth floors will contain 10 one-bedroom apartments per floor for a total of 61 apa
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Car parking, Residential, Automotive, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Paterson, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Taylor Five Apartment Building with Parking
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a three floor addition to an existing three story vacant school for a total of 6 floors plus a basement. Convert the vacant school into a 60 unit apartment building. The basement will consist of a two-bedroom apartment for the superintendent, utility room, community room and a gym. The first through sixth floors will contain 10 one-bedroom apartments per floor for a total of 61 apartments. 25 on-site parking spaces and 15 parking spaces to be located at 404-406 Totowa Avenue. ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Paterson |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Car parking, Residential, Automotive, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
