logo

TBT Tunnel Lighting Replacement Phase 2

Sector: Government • Location: San Francisco, California, United States of America

Source: Dodge

Project
Planning Schematics

TBT Tunnel Lighting Replacement Phase 2- (ON HOLD - DESIGN- 02-01-2022) Upgrade and installation of new tunnel lighting fixtures in Transbay Tube.

Status
Prospective
Sector
Government, Tunnel, Road, Commercial, Power Transmission, Power Generation (CCGT)
Location
San Francisco, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about TBT Tunnel Lighting Replacement Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TBT Tunnel Lighting Replacement Phase 2” is an infrastructure initiative in the Government sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

TBT Tunnel Lighting Replacement Phase 2- (ON HOLD - DESIGN- 02-01-2022) Upgrade and installation of new tunnel lighting fixtures in Transbay Tube.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Francisco

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Tunnel, Road, Commercial, Power Transmission, Power Generation (CCGT)

Article published date

2025-02-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project