logo
ProjectCompleted

TCBuen II

One of 9,700 projects Taiyo tracks in Colombia.

Source: International Finance Corporation (IFC)

The Sociedad Portuaria Terminal de Contenedores de Buenaventura S.A. (“TCBuen” or “The Company”) currently operates an international container terminal located in an urban area of the City of Buenaventura (“TCBuen Phase I”). Buenaventura is located on Colombia’s Pacific coast in the Department of Valle del Cauca approximately 100 kilometers from the City of Cali, the capital of the Department. P

Status
Closed
Sector
Water Supply and Storage, Consumer Products, Seaport, Residential, Commercial, Government
Location
Colombia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about TCBuen II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TCBuen II” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Sociedad Portuaria Terminal de Contenedores de Buenaventura S.A. (“TCBuen” or “The Company”) currently operates an international container terminal located in an urban area of the City of Buenaventura (“TCBuen Phase I”). Buenaventura is located on Colombia’s Pacific coast in the Department of Valle del Cauca approximately 100 kilometers from the City of Cali, the capital of the Department. Phase I of the terminal, which occupies an area of 27 hectares and includes a 490-m dock, was constructed with IFC financing and operates with a designed capacity of 268,350 twenty-foot container equivalent units (“TEUs”) under a 30-year concession ending in 2036. As part of IFC’s initial investment in 2010, TCBuen enhanced several of its environmental, social and health and safety practices for the construction and operation of the terminal, including improvements in the various components of its Management System, contingency planning, compensation processes for land owners and fishermen and biodiversity management relating to impacts on mangroves. These actions have been included in an Environmental and Social Action Plan (ESAP) agreed upon at the time of investment.The current Project (“TCBuen II” or “The Expansion”) involves the expansion of the existing 27-hectare Phase I complex to include (i) expanding the container storage areas of the terminal by 6.9 hectares and constructing a new mooring hitch over the eastern side of the quay; (ii) the incorporation of additional equipment to support existing operations and; (iii) dredging and extending the width of the access channel from 84 meters to 150 meters and of the turning basin by 50 meters, its western length by 280 meters and its eastern side by 30 meters. Once completed, the Terminal is expected to provide approximately 610,000 twenty foot equivalent units (“TEUs”) in operational capacity (forecasted up to 2019) to handle containers. TCBuen does not handle or store hydrocarbons or bulk cargo such as coal or grains.

Original sector

E-BB - Port and Harbor Operations

Location

Country

Colombia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Consumer Products, Seaport, Residential, Commercial, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project