TECH-EU POLVOLT E-WASTE AND COPPER RECYCLING
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project will finance the construction and operation of a secondary electronic waste and copper recycling facility in Zawiercie.
- Status
- Prospective
- Sector
- Metal
- Location
- Poland
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about TECH-EU POLVOLT E-WASTE AND COPPER RECYCLING
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under appraisal |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project will finance the construction and operation of a secondary electronic waste and copper recycling facility in Zawiercie. |
Original sector | Industry |
Location
Country | Poland |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Metal |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in Poland
- VOESTALPINE STEEL
- KGHM MODERNISATION PROGRAMME II
- KGHM MODERNISATION PROGRAMME
- Ostroleka C CombinedCycle Power Plant Poland
- Kozienice Coalfired Power Station Unit 11
- One-Stop-Shop Project for Offshore Wind market
- The South Baltic Area-Violence Free Zone
- In the Dunajec Valley — protection and restoration of monuments of the Polish-Slovak border: the Manor in Tylmanowa and the monastery in the Red Monastery
