Technical and environmental studies for the implementation of internal hydrogen infrastructure in Greece
Sector: Hydrogen • Location: Greece
Source: EU Funding & Tenders Portal
The project ‘H2DRIA-S’ contributes to the implementation of the Project of Common European Interest (PCI) 10.3.1 ‘Internal hydrogen infrastructure in Greece towards the Bulgarian border’ that consists of a new bidirectional hydrogen pipeline mainly from the southern part of Greece up to the Interconnection with Bulgaria. This project includes the Basic Engineering Design, the Environmental Study,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project ‘H2DRIA-S’ contributes to the implementation of the Project of Common European Interest (PCI) 10.3.1 ‘Internal hydrogen infrastructure in Greece towards the Bulgarian border’ that consists of a new bidirectional hydrogen pipeline mainly from the southern part of Greece up to the Interconnection with Bulgaria. This project includes the Basic Engineering Design, the Environmental Study, including Social Impact Assessment (ESIA), the Quantitative Risk Assessment (QRA) Study and the Detailed Design for the construction of a 570 km dedicated hydrogen pipeline (H2DRIA) extending from southern Greece to the Bulgarian border. Hydrogen is anticipated to play an essential role in the transition to a low-carbon economy and in the achievement of decarbonization targets in Greece, serving as a clean and versatile energy carrier both at a national and European level. Upon completion of these comprehensive studies, the PCI will be ready for the next stage, namely construction of the infrastructure. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
