logo

Technical Assistance for Kambarata 1 Hydropower Plant Project

Sector: Water Supply and Storage • Location: Kyrgyz Republic

Source: World Bank

Project
Active

The project will help advance the preparation of the Kambarata 1 hydropower plant so that it is ready to be financed by interested financiers and donors. The project will support activities in these areas as described below. Component 1 is expected to update the technical and economic feasibility which will identify the gaps in the previous studies, carry out additional activities as needed, possi

Status
Prospective
Sector
Water Supply and Storage, Hydro, Commercial, Government
Location
Kyrgyzstan
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Technical Assistance for Kambarata 1 Hydropower Plant Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Technical Assistance for Kambarata 1 Hydropower Plant Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Kyrgyz Republic. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will help advance the preparation of the Kambarata 1 hydropower plant so that it is ready to be financed by interested financiers and donors. The project will support activities in these areas as described below. Component 1 is expected to update the technical and economic feasibility which will identify the gaps in the previous studies, carry out additional activities as needed, possibly including physical modelling, surveys, site investigation and laboratory testing required, confirming and finalizing the selection of dam type to bring the feasibility study up-to-date and make it “bankable” and also additional work required prior to preparation of the tender documents. Component 2 will review the existing environmental and social studies, conducting additional activities including biodiversity study as required, carry out consultation with different stakeholders and updating the environmental and social documents to meet World Bank’s ESF requirements. The component will also help design an implementable benefit sharing mechanism with local community to ensure equitable and sustainable development and implementation over the long-term period. Component 3 will further support the assessment and selection of financing options, including equity investors, commercial, bilateral and multilateral debt financing, and assist in reviewing and proposing benefit and risk sharing arrangement among various stakeholders. The proposed TA project is aligned with the overarching goal of the Country Partnership Framework (CPF) 2019–22 (Report No. 130399-KG) to promote diversified, export-oriented, inclusive, sustainable growth, focusing on conditions for private sector investment. It is also aligned with the CPF 2024–2028 that is currently being developed.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Kyrgyzstan

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Commercial, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project