Technical Campus Blue Gate / POLO
Sector: Steel • Location: Antwerp
Source: ArchDaily
As the buildable plot area is limited the brief prescribes a vertical stacking of the different workshop and studio spaces. This makes for an intriguing yet challenging layout: these semi-industrial spaces have to comply with a plethora of strict health and safety regulations and technical specifications which become exponentially more complicated by locating them on upper floors. As a consequence
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | As the buildable plot area is limited the brief prescribes a vertical stacking of the different workshop and studio spaces. This makes for an intriguing yet challenging layout: these semi-industrial spaces have to comply with a plethora of strict health and safety regulations and technical specifications which become exponentially more complicated by locating them on upper floors. As a consequence, POLO conceives this building as more than just a school; we consider it a kind of “vertical factory”, where the safe and efficient functioning of the workspaces becomes an overriding concern and determinant factor in the design process.The reinforced concrete structure is calculated to incorporate not only the demands and risks associated with the current building program; it is also dimensioned to accommodate other, more structurally demanding functions, ensuring that this design is future-proof and forwardly flexible.To an extent, the building program is readable in the elevations. Horizontal ribbon windows are provided where classrooms are located. The workshops receive floor-to-ceiling glazing, delivering an abundance of daylight for the manual labor taking place within.Text description provided by the architects.In a striking freestanding building that combines two schools for vocational education, POLO solves a challenging three-dimensional jigsaw dictated by stringent technical requirements and the constraints of a small plot.In keeping with the industrial nature of the business park as well as the school’s vocational training program, the building is clad in profiled aluminum sheets in a standing seam system. The sharp geometric nature of this material is softened by perforations. This adds a sophisticated lightness and a variability in appearance, determined by the changes in daylight. It also allows for concealing air grilles and other mechanical equipment behind the cladding, keeping the external appearance of the building smooth and devoid of clutter. The building is insulated using mineral wool, which presents a more durable and fireproof solution compared to thinner PIR panels.The brownfield site “Petroleum Zuid” to the south ofAntwerpis being developed into a sustainable business park called Blue Gate. Besides the commercial component, the plans include the provision of a green corridor and public facilities. As part of the latter, a new building at the far corner of the development is to incorporate two vocational schools: one of them (WLAZ) offers practice-based secondary education in a work/learn program, and the other (ENCORA) teaches vocational skills to adults. The mixing of students from different backgrounds and the proximity to future employers should make this institute into an ideal springboard for students’ careers.The building plan is based on a staggered layout of rectangles to accommodate the parallelogram-shaped plot. The two main blocks containing the workshops and classrooms are linked by a central circulation core, which is to be the throbbing heart of the building. Here a spacious freight elevator serves the different workshops — large enough to transport raw materials, tools, and even forklifts to the upstairs training spaces. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
