Tecon Santa Catarina
Sector: Commercial • Location: Santa Catarina, Brazil
Source: World Bank Group
In August 2005, Tecon Santa Catarina (TCS) consortium signed an agreement with the state governor of Santa Catarina to develop a new, modern container port in Itapoa Bay of Babitonga, Santa Catarina state. The container port was designed with a 450,000 teu capacity as well as three berths at the end of a pier that would reduce the cost required for dredging but were expected to increase the operat
- Status
- Prospective
- Sector
- Commercial, Seaport, Water Supply and Storage, Government
- Location
- Santa Catarina, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tecon Santa Catarina
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In August 2005, Tecon Santa Catarina (TCS) consortium signed an agreement with the state governor of Santa Catarina to develop a new, modern container port in Itapoa Bay of Babitonga, Santa Catarina state. The container port was designed with a 450,000 teu capacity as well as three berths at the end of a pier that would reduce the cost required for dredging but were expected to increase the operating costs of the terminal. With a depth of 16 m, the port was designed to handle the world’s largest container vessels Tecon Santa Catarina (TCS) consortium, the project company, was owned by private companies Alianca Navegacao e Logistica Ltda (30%) and Batistella Group (70%). The first investor was a subsidiary of German Hamburg Sud Group. Financial closure was reached in November 2007, when a US $144 million loan was approved by the Inter-American Development Bank. The package comprised an IDB loan of up to US $57.6 million from the Bank’s ordinary capital and approximately US $86.4 million of co-financing from commercial banks. The port was designed and implemented by project investors to meet Santa Catarian’s growing demand for port capacity to handle refrigerated cargo, including chicken, pork, and other products. The new port, whose construction started in March 2007, was scheduled to begin commercial operations in the 1st semester of 2010. In June 2009, the project company was granted a BRL 330 million 10-year loan by BVA Bank to finance the investment in the terminal (11% interest rate was set to be charged plus an adjustment for annual inflation). Operations on the facility commenced in December 2010. |
Original sector | Transport |
Budget |
Location
Country | Brazil |
State | Santa Catarina |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Seaport, Water Supply and Storage, Government |
Article published date | 2024-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia