Teconvi
Sector: Seaport • Location: Santa Catarina, Brazil
Source: World Bank Group
In August 2001 a 25 year lease for the container terminal at Itajai port was awarded to a consortium led by Andraus Engenharia e Construcoes. Terminal de Conteineres do Vale do Itajai (Teconvi) is located in the state of Santa Catarina. Andraus began operating the terminal in January 2002.
As of late 2004/beginning of 2005, the main sponsors of Teconvi were: Santa Catarina Participacoes S/A (46
- Status
- Prospective
- Sector
- Seaport, Government, Water Supply and Storage
- Location
- Santa Catarina, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Teconvi
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In August 2001 a 25 year lease for the container terminal at Itajai port was awarded to a consortium led by Andraus Engenharia e Construcoes. Terminal de Conteineres do Vale do Itajai (Teconvi) is located in the state of Santa Catarina. Andraus began operating the terminal in January 2002. As of late 2004/beginning of 2005, the main sponsors of Teconvi were: Santa Catarina Participacoes S/A (46.54%), Cattalini Terminais Maritimos Ltda (23.65%), Marcon Servicos e Despachos em Geral Ltda. (21.34%). In May 2005, AP Moller-Maersk -through a subsidiary called Technical Investimentos e Participacoes Ltda- bought a 50% stake in Teconvi on an operation worth US$35.5 million. After the operation, the remaining stakeholders were Cattalini Terminais Maritimos Ltda (30%) and Marcon Servicos e Despachos em Geral Ltda. (20%). In the first phase of the rehabilitation works, Teconvi invested US$ 40 million (between 2003 and 2007). In 2007, APM Terminals acquired 100% of Teconvi's shares. In February 2008, Teconvi commenced the second phase of the investments in the terminal, and included the construction of a new berth and the expansion of the containers storage area. Investments on this second phase, which were expected to be completed by the second half of 2009, were estimated at US$ 54.6 million (BRL 100 million). By April 2009, the construction works had already been completed and the operations started on the new berth. |
Original sector | Transport |
Budget |
Location
Country | Brazil |
State | Santa Catarina |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Seaport, Government, Water Supply and Storage |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project