Teesta-3 Hydropower Project
Sector: Hydro • Location: Chungthang, Sikkim, India
Source: The Hindu
The Teesta-3 hydropower project is a 1,200-MW power generation facility in North Sikkim, India. It was severely damaged by a glacial lake outburst flood (GLOF) in October 2023 caused by the sudden break of the South Lhonak lake, which released millions of tonnes of water, debris, and rock, destroying infrastructure and causing casualties.
- Status
- Failure
- Sector
- Hydro, Power Generation (CCGT), Water Supply and Storage
- Location
- Chungthang, Sikkim, India
- Updated
- 22 Jul 2026
- Source
- The Hindu
ConstructChat
Ask ConstructChat about Teesta-3 Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | damaged |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Teesta-3 hydropower project is a 1,200-MW power generation facility in North Sikkim, India. It was severely damaged by a glacial lake outburst flood (GLOF) in October 2023 caused by the sudden break of the South Lhonak lake, which released millions of tonnes of water, debris, and rock, destroying infrastructure and causing casualties. |
Original sector | Energy |
Location
Country | India |
State | Sikkim |
City | Chungthang |
Source
Source | The Hindu |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Water Supply and Storage |
Article published date | 2025-11-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
