Teesta Masterplan Project
Sector: Water Supply and Storage • Location: Kaunia, Rangpur, Bangladesh
Source: United News of Bangladesh
The Teesta Masterplan project aims to ensure sustainable management of the Teesta River and fair distribution of its water resources between Bangladesh and India. The project is expected to be finalized within the tenure of the interim government, with a focus on collaboration and equitable water sharing.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government
- Location
- Kaunia, Rangpur, Bangladesh
- Updated
- 22 Jul 2026
- Source
- United News of Bangladesh
ConstructChat
Ask ConstructChat about Teesta Masterplan Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Teesta Masterplan project aims to ensure sustainable management of the Teesta River and fair distribution of its water resources between Bangladesh and India. The project is expected to be finalized within the tenure of the interim government, with a focus on collaboration and equitable water sharing. |
Original sector | Water Management |
Location
Country | Bangladesh |
State | Rangpur |
City | Kaunia |
Source
Source | United News of Bangladesh |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bangladesh
- Bibiyana South CombinedCycle Power Plant
- Maitree Super Thermal Power Project Bangladesh
- Payra Sea Port Dredging Concession
- Chittagong Container Terminal (second contract)
- SAIDABAD RAW WATER CONVEYOR
- Sirajganj 225 MW Combined Cycle Power Plant (2nd Unit-Dual Fuel)
- Moheshkhali Floating LNG Terminal
- Gandharbpur Drinking Water Treatment Plant
