logo

TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEESTA HYDRO POWER LIMITED [A wholly owned Subsidiary of NHPC LTD. acquired through NCLT]

Sector: Hydro • Location: Namchi, Sikkim, India

Source: India Investment Grid (IIG)

Project
Under Implementation

Information NHPC has come up with TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEESTA HYDRO POWER LIMITED [A wholly owned Subsidiary of NHPC LTD. acquired through NCLT] with a ticket size of 5748.04 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of

Project Information FAQ

Project Information

5 Q
The project “TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEESTA HYDRO POWER LIMITED [A wholly owned Subsidiary of NHPC LTD. acquired through NCLT]” is an infrastructure initiative in the Hydro sector, located in Namchi, Sikkim, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information NHPC has come up with TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEESTA HYDRO POWER LIMITED [A wholly owned Subsidiary of NHPC LTD. acquired through NCLT] with a ticket size of 5748.04 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project Teesta Stage-VI Hydroelectric Project located in Southern Sikkim is a run off the river scheme. The project has an installed capacity of 500 MW with 4 Nos. units of 125 MW each. The project comprises of 26.5m high Barrage, 2 nos. Desilting basins surface, Silt flushing tunnel, 2 nos. Intake, 2 nos. Head Race Tunnel, 2 nos. Surge shaft, 4 nos. vertical steel lined pressure shafts, MIV cavern, Power house cavern, Transformer cavern, 4 nos. tail race tunnel and Pothead. The Project was earlier proposed to be developed by an SPV M/s Lanco Teesta Hydro Power Ltd LTHPL, promoted by the Lanco Group but could not be developed by it due to financial crunch. The NCLT started insolvency proceedings against Lanco Group in April 2018 and NHPC emerged as the successful bidder in December 2018. CCEA approved NHPC proposal to take over the project in March 2019, while the NCLT granted approval for the acquisition under the corporate insolvency resolution process in July 2019. Project is being executed by LTHPL A wholly owned subsidiary of NHPC Ltd.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%