Tehri Pumped Storage Plant Project [4x250 MW]
Sector: Geothermal • Location: Tehri Garhwal, Uttarakhand, India
Source: India Investment Grid (IIG)
Information THDC India Limited has come up with Tehri Pumped Storage Plant Project [4x250 MW] with a ticket size of 5726.5 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Tehri PSP has been envisaged to generate 1000 MW of peaking
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information THDC India Limited has come up with Tehri Pumped Storage Plant Project [4x250 MW] with a ticket size of 5726.5 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Tehri PSP has been envisaged to generate 1000 MW of peaking power for enhancing system reliability and also to provide balancing load to the thermal and renewable generation during off peak hours. The reservoir created by the Tehri Dam and Koteshwar Dam would function as upstream and downstream reservoir for Pump Storage Plant. This Plant will contribute to stabilization by meeting the peak load and balancing requirement. Tehri PSP comprising of four reversible pump turbine units of 250 MW each, involves construction of an Underground Machine Hall on the left bank of river Bhagirathi. The main feature of the Project is the large variation of about 90 m between the maximum and minimum head, under which the reversible units shall operate. The operation of Tehri PSP is based on the concept of recycling of water discharged between upper reservoir to lower reservoir. On completion, additional generating capacity of 1000 MW, peaking power, will be added to the Northern Region [annual generation of 1321.82 million units]. For pumping operation of reversible units, the off-peak energy requirement will be of the order of 1651.66 MU. With the construction of Tehri PSP, Tehri Hydro power Complex shall function as a major peaking station having an installed capacity of 2400 MW. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
