Tehri Pumped Storage Project
The owner, status and timeline of this project. A free account opens every field.
Source: PIB
The Tehri Pumped Storage Project is a hydroelectric project with a capacity of 500 MW, successfully commissioned during 2025-26. It contributes to the national grid by storing surplus green power and providing electricity during non-solar hours.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Government
- Location
- Tehri, Uttarakhand, India
- Updated
- 22 Jul 2026
- Source
- PIB
ConstructChat
Ask ConstructChat about Tehri Pumped Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Tehri Pumped Storage Project is a hydroelectric project with a capacity of 500 MW, successfully commissioned during 2025-26. It contributes to the national grid by storing surplus green power and providing electricity during non-solar hours. |
Original sector | Energy |
Location
Country | India |
State | Uttarakhand |
City | Tehri |
Source
Source | PIB |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Government |
Article published date | 2025-11-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
