logo
ProjectUnder Construction

Tehri Pumped Storage Project

Sector: Hydro • Location: Tehri, Uttarakhand, India

Source: Construction World

THDC India has synchronized the first 250 MW unit of its 1000 MW pumped storage plant at Tehri, Uttarakhand. The project will consist of four units of 250 MW each, and once fully operational, it will increase the total installed capacity of the Tehri hydro power complex to 2400 MW.

Status
Under Construction
Sector
Hydro, Government, Power Generation (CCGT)
Location
Tehri, Uttarakhand, India
Updated
22 Jul 2026
Source
Construction World

ConstructChat

Ask ConstructChat about Tehri Pumped Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tehri Pumped Storage Project” is an infrastructure initiative in the Hydro sector, located in Tehri, Uttarakhand, India. Taiyo aggregates data on it from Construction World.

Participants

Sponsoring Agency

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

THDC India has synchronized the first 250 MW unit of its 1000 MW pumped storage plant at Tehri, Uttarakhand. The project will consist of four units of 250 MW each, and once fully operational, it will increase the total installed capacity of the Tehri hydro power complex to 2400 MW.

Original sector

Energy

Location

Country

India

State

Uttarakhand

City

Tehri

Source

Source

Construction World

URL

More Details

Record type

Project

Sector

Hydro, Government, Power Generation (CCGT)

Article published date

2025-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project