TELECOMMUNICATIONS I
Sector: Power Generation (CCGT) • Location: Algeria
Source: World Bank Group
The proposed project consists of: (i) construction of 5 coaxial cable links between transit exchanges in ten wilayas (provinces) and their linking to the main east-west and north-south trunk routes; (ii) the automation of regional cable and transmission systems in 22 wilayas, including the automation of small capacity exchanges and the connection of some 42,000 new distant subscribers; (iii) const
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Algeria
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TELECOMMUNICATIONS I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of: (i) construction of 5 coaxial cable links between transit exchanges in ten wilayas (provinces) and their linking to the main east-west and north-south trunk routes; (ii) the automation of regional cable and transmission systems in 22 wilayas, including the automation of small capacity exchanges and the connection of some 42,000 new distant subscribers; (iii) construction and rehabilitation of local cable networks in about 450 large medium towns in order to connect approximately 310,000 new telephone subscribers; (iv) setting up of about 600 public telephone call offices in isolated rural areas and communities now without access to telecommunications services; (v) provision of equipment and materials for large regional centers and stores, tools and machinery for network construction, power supply and testing equipment; and (vi) technical assistance and training in management and organization of telecommunications development and operations, development planning and engineering, financial management, accounting and cost accounting. The project would be carried out from 1983 to 1988. |
Original sector | Information and Communications Technologies |
Location
Country | Algeria |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
