TELECOMMUNICATIONS I
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The 1968-73 IBTE program amounts to about US$25 million equivalent, of which the foreign exchange component is estimated at US$16 million. The major part of the program consists of improvements in local and long distance telephone networks (US$9 million for each). An additional US$1 million is included for telegraph, telex and high frequency radio. The rest of the program is comprised of land and
- Status
- Closed
- Sector
- Government
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TELECOMMUNICATIONS I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 1968-73 IBTE program amounts to about US$25 million equivalent, of which the foreign exchange component is estimated at US$16 million. The major part of the program consists of improvements in local and long distance telephone networks (US$9 million for each). An additional US$1 million is included for telegraph, telex and high frequency radio. The rest of the program is comprised of land and buildings, miscellaneous items, and provision for contingencies. The economic rate of return, as a measure of the economic progress made possible by better communication, is difficult to measure. However it may be argued that the prices which users are willing to pay for telecommunications services give at least a minimum indication of this value. The incremental rate of return on the proposed investment, valuing services at current tariffs, is 15 percent. |
Original sector | Information and Communications Technologies |
Location
Country | Ethiopia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- Production of long Cut-Pasta products
- An expansion on producing Bottled water
- A project for the establishment of new production facility and new product development through a joint venture project
- Expansion of production facility for Ethiopian spices
- Coffee processing plant
- Establishing a Joint Venture/Establishment of an additional production facility/Packaging activities/Three Y Flexible Packaging Plc
- Expansion project for bottling natural mineral water
