Telecommunications Infrastructure Install SOURCES SOUGHT
Closed · California · Last reported Jul 2025
Source: Dodge
This construction project will directionally bore no more than 200 linear feet and install underground conduit, coaxial cabling, weatherproof boxes, and all required services and materials to prepare the residence for future COMCAST internet.
- Status
- Closed
- Sector
- Power Generation (CCGT), Broadband, Car parking, Telecommunications, Power Transmission, Commercial, Automotive
- Location
- Menlo Park, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Telecommunications Infrastructure Install SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This construction project will directionally bore no more than 200 linear feet and install underground conduit, coaxial cabling, weatherproof boxes, and all required services and materials to prepare the residence for future COMCAST internet. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Menlo Park |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Broadband, Car parking, Telecommunications, Power Transmission, Commercial, Automotive |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
