logo
ProjectClosed

TELECOMMUNICATIONS

Sector: Power Generation (CCGT) • Location: Colombia

Source: World Bank Group

The project would consist of: (A) Principal Long-Distance Telephone Systems: (i) microwave systems interconnecting principal cities; (ii) short coaxial and voice frequency cable systems; (iii) recovery and reinstallation of existing VHF radio equipment; (iv) carrier equipment; (v) toll switching equipment in 83 cities and towns. (B) Increase in the long-distance circuits between the large capacity

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about TELECOMMUNICATIONS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TELECOMMUNICATIONS” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project would consist of: (A) Principal Long-Distance Telephone Systems: (i) microwave systems interconnecting principal cities; (ii) short coaxial and voice frequency cable systems; (iii) recovery and reinstallation of existing VHF radio equipment; (iv) carrier equipment; (v) toll switching equipment in 83 cities and towns. (B) Increase in the long-distance circuits between the large capacity microwave system and the communities not served by it; (C) New urban facilities; (D) Interconnection facilities, mainly automatic equipment; (E) Expansion of international service through the addition of five 30 kw high frequency radio transmitters and accompanying equipment.

Original sector

Information and Communications Technologies

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project