Telephone Lift Station #19
Sector: Water Supply and Storage • Location: Richmond Hill, Georgia, United States of America
Source: Dodge USA
This work will include all equipment, materials, supplies, labor, and all other costs associated with grading the site, construction of an access road, demolition of the existing lift station and construction of the stormwater system, water and sewer system and installation of the lift station.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Richmond Hill, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Telephone Lift Station #19
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work will include all equipment, materials, supplies, labor, and all other costs associated with grading the site, construction of an access road, demolition of the existing lift station and construction of the stormwater system, water and sewer system and installation of the lift station. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Richmond Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
