Teles Pires HPP
Sector: Commercial • Location: Brazil
Source: World Bank Group
In December 2010, the Brazilian consortium Teles Pires Energia Eficiente (Iberdrola's subsidiary Neoenergia, 50,1%, state-owned Eletrosul, 24,5%, state-owned Furnas, 24,5%, and Odebrecht, 0,9%) was awarded in a competitive bidding process the contract to build and operate a 1820 MW hydro power plant located in the Teles Pires River, between the states of Para and Mato Grosso. Besides Teles Pires
- Status
- Prospective
- Sector
- Commercial, Hydro, Power Generation (CCGT), Manufacturing (Industrial), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Teles Pires HPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2010, the Brazilian consortium Teles Pires Energia Eficiente (Iberdrola's subsidiary Neoenergia, 50,1%, state-owned Eletrosul, 24,5%, state-owned Furnas, 24,5%, and Odebrecht, 0,9%) was awarded in a competitive bidding process the contract to build and operate a 1820 MW hydro power plant located in the Teles Pires River, between the states of Para and Mato Grosso. Besides Teles Pires Energia Eficiente, three other companies took part in the bidding contest, but the names of the other bidders were not released. The bidding criteria set by the regulatory agency ANEEL was the lowest tariff. Teles Pires Energia Eficiente presented the lowest offer, a value of US$ 34.7/MWh (BRL 58.36/MWh), 33% below the ceiling set by the regulatory agency. The contract was signed in June 2011, and sponsors created the company Companhia Hidreletrica Teles Pires to lead the project during the 35-year contract period. Companhia Hidreletrica Teles committed to sell 85% of the output to the regulated market (a 30-year power purchase agreement was signed) and the remaining 15% to the unregulated market. Environmental regulator, Ibama, awarded an environmental license for the project in August 2011. Construction works stated in August 2011, and commercial operations were expected to commence by 2015. The sponsor committed to invest US$ 1.9 billion (BRL 3.7 billion) in the power plant. As of August 2011, construction works had not commenced. The Consorcio Construtor Teles Pires comprised by Norberto Odebrecht, Voith and Alstom Hydro Energia Brasil Ltda was hired in November 2011 to conduct EPC works for the project. In December 2011, the state-owned development bank BNDES granted a US$ 275.7 million (BRL 450 million) loan to the project company, but financial closure for the project was only achieved in September 2012, when BNDES approved an additional US$ 1235 million (BRL 2412 million) loan package to the project. http://www.brightwire.com/news/33574 |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Hydro, Power Generation (CCGT), Manufacturing (Industrial), Government |
Article published date | 2024-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia