Tema Liquefied Natural Gas (LNG) Terminal
Sector: Commercial • Location: Ghana
Source: Hydrocarbon Technology
Quantum Power Ghana Gas Limited (QPGGL), in partnership with Ghana National Petroleum Corporation (GNPC), will build the Tema Liquefied Natural Gas (LNG) facility 12km off the coast of Tema, in the Greater Accra Region in the Eastern part of Ghana. The LNG project is estimated to attract an investment of $550m, and is planned to be implemented on a build-own-operate-transfer (BOOT) basis involvin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Quantum Power Ghana Gas Limited (QPGGL), in partnership with Ghana National Petroleum Corporation (GNPC), will build the Tema Liquefied Natural Gas (LNG) facility 12km off the coast of Tema, in the Greater Accra Region in the Eastern part of Ghana. The LNG project is estimated to attract an investment of $550m, and is planned to be implemented on a build-own-operate-transfer (BOOT) basis involving the transfer of assets to GNPC after a 20-year term. It will provide GNPC with the flexibility to manage irregular power demand and variable domestic gas supply. Tema LNG will meet Ghana’s growing energy demand and will also provide the domestic power generation industry with reliable and clean fuel supply to meet projected power and industrial needs for the next 20 years. The operations of the Tema LNG facility are expected to begin by the end of 2016. The Tema LNG project will be situated 2.5km northeast of Tema New Town, which is approximately 10km southeast of Prampram. The facility will have both offshore and onshore infrastructure components. The 20km² offshore site will be located 6km to southwest of Tema port, near the West Africa Gas Pipeline (WAGP) project. Tema LNG facility will have the scalable ultimate capacity to receive, store, regasify and deliver roughly 3.4 million tonnes (Mt) of LNG a year, which is equivalent to approximately 500MMscfd (million cubic feet per day) of natural gas. The project will comprise a floating storage and regasification unit (FSRU) permanently moored offshore at a new jetty built by West African Gas (WAGL). Resembling a marine vessel, the FRSU will have a length of 295m and width of 44m. It will have the initial capacity to deliver 250MMscfdof LNG or 1.75MTPA of liquefied natural gas. The FSRU will receive, regasify and export the LNG via a 16in riser, pipeline end manifold (PLEM), and a 24in pipeline to an onshore metering and distribution terminal. The onshore reception facilities are designed for the reception of gas from the FSRU via the subsea pipelines, while an associated onshore pipeline will deliver the natural gas to GNPC and its customers. Micoperi was appointed as the engineering, procurement and construction (EPC) contractor for the project in February 2016. HR Wallingford was contracted to provide assessment for the operational viability of the proposed LNG storage, regasification and delivery facilities in September 2014. The company also carried out advanced feasibility studies, which included metocean, ship mooring and operational assessments. Golar LNG was contracted to provide an offshore FSRU in August 2014. The FSRU, named Golar Tundra, was built at the Samsung Heavy Industries shipyard in South Korea and was delivered to Golar LNG in November 2015. Knight Piésold Consulting was contracted to provide full environmental and social impact assessment (ESIA) for the project’s onshore and offshore components. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
