Tema LNG Terminal Project
Failed · Ghana · Last reported Jan 2020
Source: DailyGuide Network
Helios Investment Group aimed to construct Africa's first LNG terminal in Ghana, expected to position Ghana as a regional gas hub. The project cost was estimated to be over $300 million. The terminal was expected to start operations in 2020 but has never become operational. One of the two custom-designed vessels for storage and regasification sits idle in Tema, while the second vessel remains in A
- Status
- Closed
- Sector
- LNG
- Location
- Tema, Ghana
- Updated
- 22 Jul 2026
- Source
- DailyGuide Network
ConstructChat
Ask ConstructChat about Tema LNG Terminal Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | failed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Helios Investment Group aimed to construct Africa's first LNG terminal in Ghana, expected to position Ghana as a regional gas hub. The project cost was estimated to be over $300 million. The terminal was expected to start operations in 2020 but has never become operational. One of the two custom-designed vessels for storage and regasification sits idle in Tema, while the second vessel remains in Asia and has never been commissioned. |
Original sector | Energy |
Budget |
Location
Country | Ghana |
City | Tema |
Source
Source | DailyGuide Network |
URL |
More Details
Record type | Project |
Sector | LNG |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
