Tema Port Expansion Project
One of 4,244 projects Taiyo tracks in Ghana.
Source: Ghanaian Times
The Tema Port Expansion Project is a maritime infrastructure development that expanded the Tema Port to accommodate some of the world's largest ships. It includes Terminal Three, which features a 1,400-metre quay with four berths, equipped with advanced cranes and container handling equipment, and provides storage for up to 94,120 TEUs with an annual throughput capacity exceeding three million TEU
- Status
- Closed
- Sector
- Warehouse, Seaport, Government
- Location
- Tema, Ghana
- Updated
- 22 Jul 2026
- Source
- Ghanaian Times
ConstructChat
Ask ConstructChat about Tema Port Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Tema Port Expansion Project is a maritime infrastructure development that expanded the Tema Port to accommodate some of the world's largest ships. It includes Terminal Three, which features a 1,400-metre quay with four berths, equipped with advanced cranes and container handling equipment, and provides storage for up to 94,120 TEUs with an annual throughput capacity exceeding three million TEUs. The project aims to position Ghana as a gateway to West Africa and enhance regional trade. |
Original sector | Maritime |
Budget |
Location
Country | Ghana |
City | Tema |
Source
Source | Ghanaian Times |
URL |
More Details
Record type | Project |
Sector | Warehouse, Seaport, Government |
Article published date | 2025-11-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in Ghana
- Bridge Power Project Tema
- Tema Container Terminal
- COVID-19 HEALTH RESPONSE GHANA
- Establishment of a Shea Processing factory
- FPSO Kwame Nkrumah MV 21
- Ghana - Particle Board Manufacturing
- Ghana - UT Bank Limited Trade Finance Line of Credit
- Ghana - Incentive-Based Risk-Sharing System for Agricultural Lending Project (GIRSAL)
