Temple HHSC
Construction documents · Texas · Last reported Sep 2024
Source: Dodge USA
SL#303-4-20754 - New construction of metal framed building with CMU exterior walls, TPO roof, and metal stud interior framing - Commercial ceiling, painted sheetrock walls, flooring per spec - Concrete paved parking lot, and landscaped exterio - 28,498 SF
- Status
- Closed
- Sector
- Metal, Car parking, Residential, Cement, Commercial, Automotive, Manufacturing (Industrial)
- Location
- Temple, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Temple HHSC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SL#303-4-20754 - New construction of metal framed building with CMU exterior walls, TPO roof, and metal stud interior framing - Commercial ceiling, painted sheetrock walls, flooring per spec - Concrete paved parking lot, and landscaped exterio - 28,498 SF |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Temple |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Car parking, Residential, Cement, Commercial, Automotive, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
