Temporary Asphalt Plant in Dell Rapids Quarry
Sector: Road • Location: Dell Rapids, South Dakota, United States
Source: Sioux Falls Live
A temporary asphalt plant will be operated for two weeks inside a quarry near Dell Rapids to produce asphalt for a highway project during the summer. The plant is portable, assembled on-site, and uses dryer-drums for continuous asphalt production. The operation includes assembly and site work lasting three to six weeks, with actual production expected for a maximum of two weeks.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | approved |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A temporary asphalt plant will be operated for two weeks inside a quarry near Dell Rapids to produce asphalt for a highway project during the summer. The plant is portable, assembled on-site, and uses dryer-drums for continuous asphalt production. The operation includes assembly and site work lasting three to six weeks, with actual production expected for a maximum of two weeks. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
