Temporary Control Room at Akosombo Switchyard
Sector: Power Generation (CCGT) • Location: Akosombo, Ghana
Source: MyJoyOnline
Construction of a temporary control room structure at the Akosombo Switchyard to strengthen power transmission operations. The project is being monitored by the Ministry of Energy and Green Transition and involves Ghana Grid Company (GRIDCo) and the Volta River Authority (VRA).
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of a temporary control room structure at the Akosombo Switchyard to strengthen power transmission operations. The project is being monitored by the Ministry of Energy and Green Transition and involves Ghana Grid Company (GRIDCo) and the Volta River Authority (VRA). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
