Temporary Modular Fire Station Building
Sector: Commercial • Location: Lynn, Massachusetts, United States of America
Source: Dodge USA
Construction of a 3,000 square-foot modular building at 19 porter st, lynn, ma 01902 to serve as temporary fire station quarters. The scope of this project includes, but is not limited to, the design, prefabrication, delivery, on-site assembly, and installation of the modular building. This modular building will be leased for a 12-month period and, following this duration, will require disassembly
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of a 3,000 square-foot modular building at 19 porter st, lynn, ma 01902 to serve as temporary fire station quarters. The scope of this project includes, but is not limited to, the design, prefabrication, delivery, on-site assembly, and installation of the modular building. This modular building will be leased for a 12-month period and, following this duration, will require disassembly and removal from the site |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
