Temporary Modular Fire Station Building
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge USA
Construction of a 3,000 square-foot modular building at 19 porter st, lynn, ma 01902 to serve as temporary fire station quarters. The scope of this project includes, but is not limited to, the design, prefabrication, delivery, on-site assembly, and installation of the modular building. This modular building will be leased for a 12-month period and, following this duration, will require disassembly
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Commercial, Government
- Location
- Lynn, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Temporary Modular Fire Station Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 3,000 square-foot modular building at 19 porter st, lynn, ma 01902 to serve as temporary fire station quarters. The scope of this project includes, but is not limited to, the design, prefabrication, delivery, on-site assembly, and installation of the modular building. This modular building will be leased for a 12-month period and, following this duration, will require disassembly and removal from the site |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Lynn |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
