TEMTRL 23 Dry Dock AV
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Turner Construction will be coordinating the delivery and rigging of (1) 20ft shipping container onto the loading dock to be used as a backdrop for pictures at a one night event, held inside the building. The container will be in place from 9/18/13 - 9/23/13 and then removed from the site.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about TEMTRL 23 Dry Dock AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Turner Construction will be coordinating the delivery and rigging of (1) 20ft shipping container onto the loading dock to be used as a backdrop for pictures at a one night event, held inside the building. The container will be in place from 9/18/13 - 9/23/13 and then removed from the site. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
