Ten Trails Master Planned Development (MPD) Phase 2F Div 4
Sector: Water Supply and Storage • Location: Black Diamond, Washington, United States of America
Source: Dodge
42 residential lots are proposed, consisting of seven six-unit multi-family structures. All associated improvements regarding access, utilities, landscaping, and open space will be completed by the developer. Stormwater generated from the project site will be routed to a flow control and water quality treatment facility before being discharged to an infiltration facility. The application proposes
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Mass Transit, Commercial, Rail, Residential, Power Transmission, Power Generation (CCGT)
- Location
- Black Diamond, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ten Trails Master Planned Development (MPD) Phase 2F Div 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 42 residential lots are proposed, consisting of seven six-unit multi-family structures. All associated improvements regarding access, utilities, landscaping, and open space will be completed by the developer. Stormwater generated from the project site will be routed to a flow control and water quality treatment facility before being discharged to an infiltration facility. The application proposes no impacts to off-site wetlands or approved buffers. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Black Diamond |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Mass Transit, Commercial, Rail, Residential, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
