Tenkiller Spillway Bridge Replacement Project
Sector: Hydro • Location: Gore, Oklahoma, United States
Source: DVIDS
The U.S. Army Corps of Engineers is replacing the existing steel structure of the Tenkiller Dam spillway bridge near Gore, Oklahoma, with a modern concrete design. The project involves demolition of the old bridge and construction of a new bridge while keeping the dam fully operational. The project started pre-construction work in October 2025 and is on course for completion in 2027.
- Status
- Under Construction
- Sector
- Hydro, Cement, Bridge, Steel
- Location
- Gore, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- DVIDS
ConstructChat
Ask ConstructChat about Tenkiller Spillway Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The U.S. Army Corps of Engineers is replacing the existing steel structure of the Tenkiller Dam spillway bridge near Gore, Oklahoma, with a modern concrete design. The project involves demolition of the old bridge and construction of a new bridge while keeping the dam fully operational. The project started pre-construction work in October 2025 and is on course for completion in 2027. |
Original sector | Built Sector |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Gore |
Source
Source | DVIDS |
URL |
More Details
Record type | Project |
Sector | Hydro, Cement, Bridge, Steel |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
