logo

Tenkiller Spillway Bridge Replacement

Sector: Hydro • Location: Gore, Oklahoma, United States

Source: DVIDS

Project
Under Construction

The project involves the demolition and replacement of the State Highway 100 bridge over the Tenkiller Dam Spillway near Gore, Oklahoma. The existing 72-year-old steel bridge is being dismantled piece-by-piece due to its connection to the dam, and will be replaced with a modern concrete structure. The demolition started in December 2025 and is expected to be completed by late February or early Mar

Status
Under Construction
Sector
Hydro, Cement, Road, Water Supply and Storage, Metal, Steel, Bridge, Government
Location
Gore, Oklahoma, United States of America
Updated
22 Jul 2026
Source
DVIDS

ConstructChat

Ask ConstructChat about Tenkiller Spillway Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tenkiller Spillway Bridge Replacement” is an infrastructure initiative in the Hydro sector, located in Gore, Oklahoma, United States. Taiyo aggregates data on it from DVIDS.

Participants

Sponsoring Agency

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the demolition and replacement of the State Highway 100 bridge over the Tenkiller Dam Spillway near Gore, Oklahoma. The existing 72-year-old steel bridge is being dismantled piece-by-piece due to its connection to the dam, and will be replaced with a modern concrete structure. The demolition started in December 2025 and is expected to be completed by late February or early March 2026, with the entire project duration estimated at two to two and a half years.

Original sector

Civil Works

Location

Country

United States of America (USA)

State

Oklahoma

City

Gore

Source

Source

DVIDS

URL

More Details

Record type

Project

Sector

Hydro, Cement, Road, Water Supply and Storage, Metal, Steel, Bridge, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project