Tennessee Advanced Smelter and Minerals Processing Facility
Sector: Metal • Location: Tennessee, United States
Source: Semiconductor Engineering
Korea Zinc was awarded $210M in CHIPS Act funding towards a new $6.6B Tennessee advanced smelter and minerals processing facility, providing critical semiconductor materials such as copper, gallium, germanium, and indium. The center is expected to be operational by 2029.
- Status
- Prospective
- Sector
- Metal, Advanced Electronics, Manufacturing (Industrial), Warehouse
- Location
- Tennessee, United States of America
- Updated
- 19 Nov 2026
- Source
- Semiconductor Engineering
ConstructChat
Ask ConstructChat about Tennessee Advanced Smelter and Minerals Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Korea Zinc was awarded $210M in CHIPS Act funding towards a new $6.6B Tennessee advanced smelter and minerals processing facility, providing critical semiconductor materials such as copper, gallium, germanium, and indium. The center is expected to be operational by 2029. |
Original sector | Manufacturing |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
Source
Source | Semiconductor Engineering |
URL |
More Details
Record type | Project |
Sector | Metal, Advanced Electronics, Manufacturing (Industrial), Warehouse |
Article published date | 2025-12-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
