TENNET SOUTH-WEST 380KV WEST
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project comprises the construction of the electricity transmission corridor connecting Borsselle to Rilland, in the south of Netherlands. It includes a new 380kV line from Borssele to Rilland substations, a new 380kV substation at Rilland, extension works at Borssele substation, as well as the works on the 150kV part of the same circuit.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Government
- Location
- Netherlands
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about TENNET SOUTH-WEST 380KV WEST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises the construction of the electricity transmission corridor connecting Borsselle to Rilland, in the south of Netherlands. It includes a new 380kV line from Borssele to Rilland substations, a new 380kV substation at Rilland, extension works at Borssele substation, as well as the works on the 150kV part of the same circuit. |
Original sector | Energy |
Location
Country | Netherlands |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
