TENNILLE FREIGHT DEPOT REHAB & STREETSCAPE @ 4 LOCS - PH II
Complete · Georgia
Source: Georgia Department of Transportation (GDOT)
This project consists of the rehabilitation of the Tennille Freight Depot. The depot rehabilitation consists replacement of the storefront entry, rehabilitation/repair of existing windows general repair and the repair of the existing roof. Additionally, the large freight room will be divided into two areas: welcome center and an area to display railroad artifacts/multi-purpose room. A parking lot
- Status
- Closed
- Sector
- Car parking, Rail, Government, Automotive
- Location
- Tennille, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about TENNILLE FREIGHT DEPOT REHAB & STREETSCAPE @ 4 LOCS - PH II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the rehabilitation of the Tennille Freight Depot. The depot rehabilitation consists replacement of the storefront entry, rehabilitation/repair of existing windows general repair and the repair of the existing roof. Additionally, the large freight room will be divided into two areas: welcome center and an area to display railroad artifacts/multi-purpose room. A parking lot with 14 spaces will be added facing West North Central Ave. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Tennille |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Rail, Government, Automotive |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
