Tequesta Reverse Osmosis Membrane Replacement
Sector: Waste Processing and Treatment • Location: Tequesta, Florida, United States of America
Source: Dodge
The project scope includes providing all labor, equipment, materials, and tools necessary to remove 480 60-inch existing membrane elements from one hundred twenty (120) center port pressure vessels in Trains 1 through 3, dispose of existing membranes, rebuild/replace all end cap gaskets, new Orings, permeate port seals, retainer rings, new seals and miscellaneous hardware, clean pressure vessels,
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Rail, Seaport, Commercial, Government
- Location
- Tequesta, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Tequesta Reverse Osmosis Membrane Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project scope includes providing all labor, equipment, materials, and tools necessary to remove 480 60-inch existing membrane elements from one hundred twenty (120) center port pressure vessels in Trains 1 through 3, dispose of existing membranes, rebuild/replace all end cap gaskets, new Orings, permeate port seals, retainer rings, new seals and miscellaneous hardware, clean pressure vessels, furnish and install 240 new 40-inch membranes in each train for a total of 720 membrane elements,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tequesta |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Rail, Seaport, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
