logo

Terafab Chip Manufacturing Campus Phase 1

Sector: Power Generation (CCGT) • Location: College Station, Texas, United States

Source: Commercial Search

Project
Proposed

SpaceX has proposed a $55 billion first phase of a massive chip manufacturing campus called Terafab near College Station, Texas. The project aims to produce chips for 1 terawatt of computing power annually, with total costs potentially rising to $119 billion at full buildout. The site is located in Grimes County’s Gibbons Creek Reservoir area. Tesla plans a 2 million-square-foot R&D facility next

Project Information FAQ

Project Information

4 Q
The project “Terafab Chip Manufacturing Campus Phase 1” is an infrastructure initiative in the Power Generation (CCGT) sector, located in College Station, Texas, United States. Taiyo aggregates data on it from Commercial Search.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SpaceX has proposed a $55 billion first phase of a massive chip manufacturing campus called Terafab near College Station, Texas. The project aims to produce chips for 1 terawatt of computing power annually, with total costs potentially rising to $119 billion at full buildout. The site is located in Grimes County’s Gibbons Creek Reservoir area. Tesla plans a 2 million-square-foot R&D facility next to its existing Gigafactory in Austin to support Terafab research, while manufacturing will occur at the new site due to land constraints. Intel will also be involved in the fabrication process.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data