logo

Terafab Chip Manufacturing Facility

Sector: Advanced Electronics • Location: Texas, United States

Source: USA Today

Project
Planned

SpaceX and Tesla plan to invest $55 billion to build a semiconductor manufacturing facility called Terafab in Texas. The facility will be built in multiple phases and aims to transform domestic semiconductor manufacturing capacity. It will produce chips for Optimus humanoid robots, electric vehicles, and space travel applications. The total capital investment could reach $119 billion if all phases

Status
Prospective
Sector
Advanced Electronics, Electric Vehicles (EVs), Manufacturing (Industrial), Automotive
Location
Texas, United States of America
Updated
22 Jul 2026
Source
USA Today

ConstructChat

Ask ConstructChat about Terafab Chip Manufacturing Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Terafab Chip Manufacturing Facility” is an infrastructure initiative in the Advanced Electronics sector, located in Texas, United States. Taiyo aggregates data on it from USA Today.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SpaceX and Tesla plan to invest $55 billion to build a semiconductor manufacturing facility called Terafab in Texas. The facility will be built in multiple phases and aims to transform domestic semiconductor manufacturing capacity. It will produce chips for Optimus humanoid robots, electric vehicles, and space travel applications. The total capital investment could reach $119 billion if all phases are completed.

Original sector

Manufacturing

Budget

Location

Country

United States of America (USA)

State

Texas

Source

Source

USA Today

URL

More Details

Record type

Project

Sector

Advanced Electronics, Electric Vehicles (EVs), Manufacturing (Industrial), Automotive

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project