logo

Terafab Chip Manufacturing Facility

Sector: Telecommunications • Location: Austin, Texas, United States

Source: Fortune

Project
Planned

Elon Musk's Terafab project is a plan to manufacture chips for robotics, artificial intelligence, and space data centers. The facility will be built in Austin, Texas, and jointly run by Tesla and SpaceX. It will start with an advanced technology fab equipped to make and test various types of chips, including 2 nanometer chips. The project aims to support a terawatt of computing power per year, wit

Status
Prospective
Sector
Telecommunications, Advanced Electronics, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Data Center
Location
Austin, Texas, United States of America
Updated
22 Jul 2026
Source
Fortune

ConstructChat

Ask ConstructChat about Terafab Chip Manufacturing Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Terafab Chip Manufacturing Facility” is an infrastructure initiative in the Telecommunications sector, located in Austin, Texas, United States. Taiyo aggregates data on it from Fortune.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Elon Musk's Terafab project is a plan to manufacture chips for robotics, artificial intelligence, and space data centers. The facility will be built in Austin, Texas, and jointly run by Tesla and SpaceX. It will start with an advanced technology fab equipped to make and test various types of chips, including 2 nanometer chips. The project aims to support a terawatt of computing power per year, with chips optimized for edge and inference for vehicles and robots, and high-power chips for space applications used by SpaceX and xAI.

Original sector

Technology

Location

Country

United States of America (USA)

State

Texas

City

Austin

Source

Source

Fortune

URL

More Details

Record type

Project

Sector

Telecommunications, Advanced Electronics, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Data Center

Article published date

2026-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project